Application Research 2025.Vol No.20

Citation:DOI: 10.7672 / sgjs2025200112

Key Technology of Block Assembly and Forming of Steel Reinforcement Parts in the Middle Tower Column for a Bridge Tower

CHENG Mingming

About the author:

CCCC Second Harbor Engineering Co., Ltd., Wuhan, Hubei 430040,China

Abstract:

The No. 5 bridge tower of the main channel bridge of Changtai Yangtze River Bridge adopts asteel-concrete space diamond-shaped structure. In the construction of the middle tower column, thecomponentization scheme of steel reinforcement element →steel reinforcement sheet→steel reinforcementblock→steel reinforcement part is innovatively applied. After the prefabrication of the steel block infactory, the construction platform under the tower is assembled into parts, which is the most critical lastprocess before the tower. Aiming at the problems of complex assembly operation environment, variableblock size, large closure resistance and high precision requirements under the tower, the self-pushassembly jig and its supporting technology and control measures were developed. Technological innovationrealizes the rapid and accurate assembly of steel reinforcement parts of tower columns with large inclinedangles and variable cross-sections, lays a foundation for efficient assembly on the tower, and significantlyimproved construction efficiency and quality.